Change of position by two heavy transformers
In the nuclear facility of Doel we have exchanged the position of two transformers. Because we possess an Habil clearance we have permission to work in a
In the nuclear facility of Doel we have exchanged the position of two transformers. Because we possess an Habil clearance we have permission to work in a
Lifthing took care of the loading of heavy machine parts unto a ship. At the request of the client we transported numerous heavy parts of machines
In the proton centre at the University Hospital in Leuven, we were engaged to install new, high-tech proton therapy devices. This installation included preparatory welding,
A new production line was installed in the production environment of a company in Ghent. Lifthing performed both the mechanical and electrical installation with the
In this project, we used our pick and carry crane to install heavyweight equipment in a limited space. This enabled us to position a motor
About 120 air handling units were installed and assembled in the new hospital in Roeselare. The various parts had to be brought in through openings